TrustLube supplied the DCV Balder, a deep water construction vessel, with a lubrication system allowing it to save 70% on lubricants.
Heerema Marine Contractors Nederland B.V.
TrustLube supplied the DCV Balder, a deep water construction vessel, with a lubrication system allowing it to save 70% on lubricants.
Open Gear lubricating systems on the:
• Pipe Laying equipment
• A&R winches
• J-lay tower